...
The following tasks may need to be done next.
4.a. Updating Production Rates or BOM Consumption
If you use per-material production rates, follow the same procedure with the “Export Production Rates” buttom.
If you use BOM Item or Resource Consumption, follow the same procedure with the “Export BOM Items” buttom.
...
These two files can be loaded using the following imports of the same name:
...
4.b. Recalculating values in wheel sessions
If you use Wheels, do the “Recalculate Saved Values” operation for each relevant wheel session to update the calculations and simulations.
...
4.c. Adding new Materials to Wheel Sessions
Refer to step 3 on this page on how to add materials to an existing wheel session: https://phenixps.atlassian.net/wiki/spaces/PSD/pages/1407909890/Add+a+new+SKU+including+to+the+Wheel+Design#Step-3:-Add-the-material-to-the-new-Wheel-Design-session