Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The following tasks may need to be done next.

4.a. Updating Production Rates or BOM Consumption

  1. If you use per-material production rates, follow the same procedure with the “Export Production Rates” buttom.

  2. If you use BOM Item or Resource Consumption, follow the same procedure with the “Export BOM Items” buttom.

...

These two files can be loaded using the following imports of the same name:

...

4.b. Recalculating values in wheel sessions

If you use Wheels, do the “Recalculate Saved Values” operation for each relevant wheel session to update the calculations and simulations.

...

4.c. Adding new Materials to Wheel Sessions

Refer to step 3 on this page on how to add materials to an existing wheel session: https://phenixps.atlassian.net/wiki/spaces/PSD/pages/1407909890/Add+a+new+SKU+including+to+the+Wheel+Design#Step-3:-Add-the-material-to-the-new-Wheel-Design-session